Senior Hargreaves HVAC ductwork for Liverpool Hilton free RSS news feed from the Plumbing, Heating, Ventilation and Air Conditioning News Portal
(19/11/2008)

The Hilton hotel forms the final phase in the £920 million, 42 acre, Liverpool One development by Grosvenor. The hotel will overlook Chavasse Park, a new public open space. Lavish facilities including top class restaurants, bars, health club, meeting rooms and conference suites, will provide guests with a stay to remember.

The prestigious 215 bedroom Liverpool Hilton, under construction and due to open in Summer 2009, will be supplied with HVAC ductwork by specialist contractor Senior Hargreaves. Kier Build Limited is the main contractor. Ductwork for air input and extract will ensure comfort and fire safety for guests and staff at the hotel. The contract also includes ventilation for 47 luxury apartments within the same building.

Energy conservation is a key principle in the HVAC design. Heat recovery is therefore used on exhaust systems and rates of ventilation are closely related to occupancy and under the control of the building management system (BMS).

Heating and ventilation ductwork installation will take pace during a 43 week fit out phase. Kier Build is responsible for design, construction and management of the services fit-out with Kier's in-house M&E department. Hargreaves will supply and install backbone ductwork for air delivery and removal along with the smaller final connections.

For maximum flexibility and to give guests control, air input to bedrooms will be cooled or tempered by individual fan coil units regulated by room thermostat. This conditioned air will be delivered via a bulkhead plenum and grille into the room. Extract from bathroom pods will be via a single blade damper connection to 125mm galvanised ducts that feed into the main extract systems.

Plant rooms, some totally closed and others open to the sky, are located at mezzanine and roof level. Staff kitchens in the basement and the restaurant kitchen at ground floor level are ventilated by Hargreaves HFD kitchen extract fire duct. This is an insulated duct with access panels to permit thorough cleaning. Hargreaves standard specification stability, integrity and insulated HFD ducting is also used for smoke extract from the basement. HFD fire ducts are also used to supply the essential make-up air. The smoke extract ducts pass through the building to discharge safely at mezzanine plant room level.

The apartments are ventilated on a whole house basis with distribution via 204mm space saving plastic ductwork. These systems also have heat recovery, but are not connected to the hotel BMS. Continuous airflow is maintained at all times with facilities for occupiers to increase rates of air flow, heating and cooling as desired.

Share/Save/Bookmark | print versionPrint version | email this to a friendEmail to a friend | view other articles View other articles


[View all articles about Senior Hargreaves]

Related categories:  Air conditioning - commercial and industrial   Air movement and Fans   Commercial and offices applications   Ventilation 


directory of heating, plumbing and air conditioning suppliers
Search directory Register your company

Plumbing HVAC books and tools
Plumbing, heating and HVAC books and tools in association with Amazon.co.uk

Home | About Us | Contact Us | Submit your article | Advertise | Newsletter | Online store | RSS Newsfeed | SEARCH
SEARCH NEWS
DIRECTORY
Google